<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Relocation Case Studies Archives - British Association of Removers</title>
	<atom:link href="https://bar.co.uk/portfolio_category/relocation-case-studies/feed/" rel="self" type="application/rss+xml" />
	<link>https://bar.co.uk/portfolio_category/relocation-case-studies/</link>
	<description>The trade association for removal companies in the UK</description>
	<lastBuildDate>Wed, 12 Sep 2018 11:09:35 +0000</lastBuildDate>
	<language>en-GB</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=7.1.5</generator>
	<item>
		<title>A specialist move by Purdie Worldwide</title>
		<link>https://bar.co.uk/portfolio-items/a-specialist-move-by-purdie-worldwide/</link>
		
		<dc:creator><![CDATA[jo@rubiconmarketing.net]]></dc:creator>
		<pubDate>Wed, 29 Nov 2017 11:31:08 +0000</pubDate>
				<guid isPermaLink="false">https://bar.co.uk/?post_type=avada_portfolio&#038;p=25841</guid>

					<description><![CDATA[<p>A specialist move by Purdie Worldwide   Delivering 2 large crates of medical equipment would initially seem an easy job. However, this case study from our recent job for Quotient demonstrates the potential problems and pitfalls that can occur if a job isn’t surveyed properly and there’s a need for Specialist Movers. Specialist  [...]</p>
<p>The post <a href="https://bar.co.uk/portfolio-items/a-specialist-move-by-purdie-worldwide/">A specialist move by Purdie Worldwide</a> appeared first on <a href="https://bar.co.uk">British Association of Removers</a>.</p>
]]></description>
										<content:encoded><![CDATA[<div class="fusion-fullwidth fullwidth-box fusion-builder-row-1 nonhundred-percent-fullwidth non-hundred-percent-height-scrolling" style="--awb-border-radius-top-left:0px;--awb-border-radius-top-right:0px;--awb-border-radius-bottom-right:0px;--awb-border-radius-bottom-left:0px;--awb-flex-wrap:wrap;" ><div class="fusion-builder-row fusion-row"><div class="fusion-layout-column fusion_builder_column fusion-builder-column-0 fusion_builder_column_1_1 1_1 fusion-one-full fusion-column-first fusion-column-last" style="--awb-bg-size:cover;"><div class="fusion-column-wrapper fusion-flex-column-wrapper-legacy"><div class="fusion-title title fusion-title-1 fusion-sep-none fusion-title-text fusion-title-size-one" style="--awb-margin-top-small:0px;--awb-margin-right-small:0px;--awb-margin-bottom-small:20px;--awb-margin-left-small:0px;"><h1 class="fusion-title-heading title-heading-left fusion-responsive-typography-calculated" style="margin:0;--fontSize:38;line-height:1.11;"><h1>A specialist move by Purdie Worldwide</h1></h1></div><div class="fusion-clearfix"></div></div></div><div class="fusion-layout-column fusion_builder_column fusion-builder-column-1 fusion_builder_column_2_3 2_3 fusion-two-third fusion-column-first" style="--awb-bg-size:cover;--awb-margin-bottom:0px;width:65.3333%; margin-right: 4%;"><div class="fusion-column-wrapper fusion-flex-column-wrapper-legacy"><div class="fusion-text fusion-text-1"><p style="font-size: 18px;">Delivering 2 large crates of medical equipment would initially seem an easy job. However, this case study from our recent job for Quotient demonstrates the potential problems and pitfalls that can occur if a job isn’t surveyed properly and there’s a need for Specialist Movers.</p>
<h2>Specialist Moving Techniques</h2>
<p>Delivering Medical Equipment using Specialist Moving Techniques and a Crane! At Purdie Worldwide we are proud to be recognised as Specialist Movers.</p>
<p>As only a handful of Scottish CMG members are properly certified to undertake a delivery of this scale, we were privileged to have been asked to perform this move on a regular basis.</p>
</div><div class="fusion-image-element fusion-image-align-center in-legacy-container" style="text-align:center;--awb-caption-title-font-family:var(--h2_typography-font-family);--awb-caption-title-font-weight:var(--h2_typography-font-weight);--awb-caption-title-font-style:var(--h2_typography-font-style);--awb-caption-title-size:var(--h2_typography-font-size);--awb-caption-title-transform:var(--h2_typography-text-transform);--awb-caption-title-line-height:var(--h2_typography-line-height);--awb-caption-title-letter-spacing:var(--h2_typography-letter-spacing);"><div class="imageframe-align-center"><span class=" fusion-imageframe imageframe-none imageframe-1 hover-type-none"><img fetchpriority="high" decoding="async" width="720" height="480" title="medical-purdie" src="https://bar.co.uk/wp-content/uploads/2018/07/medical-purdie.jpg" alt class="img-responsive wp-image-25764" srcset="https://bar.co.uk/wp-content/uploads/2018/07/medical-purdie-200x133.jpg 200w, https://bar.co.uk/wp-content/uploads/2018/07/medical-purdie-400x267.jpg 400w, https://bar.co.uk/wp-content/uploads/2018/07/medical-purdie-600x400.jpg 600w, https://bar.co.uk/wp-content/uploads/2018/07/medical-purdie.jpg 720w" sizes="(max-width: 767px) 100vw, 720px" /></span></div></div><div class="fusion-sep-clear"></div><div class="fusion-separator fusion-full-width-sep" style="margin-left: auto;margin-right: auto;margin-top:30px;width:100%;"></div><div class="fusion-sep-clear"></div><div class="fusion-text fusion-text-2"><h2>Client Requirement</h2>
<ul>
<li>Deliver 2x Large pieces of Medical Equipment from the Ground Level onto the Roof Top</li>
<li>Move 2x Large pieces of Medical Equipment from Roof Top through fire escape and into desired position on the second floor.</li>
</ul>
<h2>Survey Issues</h2>
<ul>
<li>The initial thought was to put these large crates into the lifts and transport them up to the second floor.</li>
<li>After measuring the lift space and the crates, it was discovered the crates were too big for the lift by only 50mm in length.</li>
<li>The only other available access is on the roof top. However, upon inspection the roof was found to be particularly fragile and would be damaged if the entire weight of the crates were placed directly on to the roof.</li>
<li>The last issue lies with the movement of the crates from the roof through the fire escape. A vulnerable area was identified at the edge of the roof next to the fire escape where the water drains through some grating. In order to bridge this gap and avoid this potential hazard, Aluminium ramps were placed as a bridge between the roof and fire escape exit to avoid this hazard.</li>
</ul>
<h2>Project Solution</h2>
<ul>
<li>Working alongside Bernard Hunter who supplied the crane and driver we created a 5-layer landing pad to support the crates on the roof.</li>
<li>On the roof top itself a layer of hard board was then laid down to spread the load.</li>
<li>The next layer added to the landing pad was made from Furni-Guard material. This is comprised of a plastic coating, a bubble blanket and then a soft fibre coating to stop any marks.</li>
<li>Above the layer of Furni-Guard a layer of heavy card is then added, followed by a further layer of Furni-Guard. When the Furni Guard is wrapped round the card this creates a cushion effect.</li>
<li>The very last layer to be added to the landing pad is the wooden beams. These are centralised on the landing pad to ensure the crane positions the crates in the correct location.</li>
<li>The landing site is prepared and made safe (including the removal of hand rails). The crates were then lifted from the ground using the crane’s lifting cradle up to the prepared roof top area.</li>
<li>Using skids and man power, the crates are to be lifted into the building via the fire escape.</li>
<li>Once inside the crates will be guided to their final location as per the client’s instructions using skids.</li>
</ul>
</div><div class="fusion-clearfix"></div></div></div><div class="fusion-layout-column fusion_builder_column fusion-builder-column-2 fusion_builder_column_1_3 1_3 fusion-one-third fusion-column-last" style="--awb-padding-top:20px;--awb-padding-right:20px;--awb-padding-bottom:20px;--awb-padding-left:20px;--awb-bg-size:cover;--awb-border-color:#eaeaea;--awb-border-top:1px;--awb-border-right:1px;--awb-border-bottom:1px;--awb-border-left:1px;--awb-border-style:solid;width:30.6666%;"><div class="fusion-column-wrapper fusion-flex-column-wrapper-legacy"><div class="fusion-image-element fusion-image-align-center in-legacy-container" style="text-align:center;--awb-caption-title-font-family:var(--h2_typography-font-family);--awb-caption-title-font-weight:var(--h2_typography-font-weight);--awb-caption-title-font-style:var(--h2_typography-font-style);--awb-caption-title-size:var(--h2_typography-font-size);--awb-caption-title-transform:var(--h2_typography-text-transform);--awb-caption-title-line-height:var(--h2_typography-line-height);--awb-caption-title-letter-spacing:var(--h2_typography-letter-spacing);"><div class="imageframe-align-center"><span class=" fusion-imageframe imageframe-none imageframe-2 hover-type-none"><img decoding="async" width="350" height="290" title="purdie-logo" src="https://bar.co.uk/wp-content/uploads/2017/03/purdie-logo.jpg" alt class="img-responsive wp-image-25736" srcset="https://bar.co.uk/wp-content/uploads/2017/03/purdie-logo-200x166.jpg 200w, https://bar.co.uk/wp-content/uploads/2017/03/purdie-logo.jpg 350w" sizes="(max-width: 767px) 100vw, 350px" /></span></div></div><div class="fusion-sep-clear"></div><div class="fusion-separator fusion-full-width-sep" style="margin-left: auto;margin-right: auto;margin-top:30px;width:100%;"></div><div class="fusion-sep-clear"></div><div class="fusion-text fusion-text-3"><p style="text-align: center;"><strong>Purdie Worldwide Removals &amp; Storage Ltd</strong></p>
<p style="text-align: center;"><a href="https://www.purdieworldwide.co.uk">www.purdieworldwide.co.uk</a><br />
<strong><br />
Telephone:</strong><br />
01506 652792</p>
<p style="text-align: center;"><strong>Email:</strong><br />
<a href="mailto:info@purdieworldwide.co.uk">info@purdieworldwide.co.uk</a></p>
</div><div class="fusion-clearfix"></div></div></div></div></div>
<p>The post <a href="https://bar.co.uk/portfolio-items/a-specialist-move-by-purdie-worldwide/">A specialist move by Purdie Worldwide</a> appeared first on <a href="https://bar.co.uk">British Association of Removers</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>MDBA Missiles choose Xpress</title>
		<link>https://bar.co.uk/portfolio-items/mdba-missiles-choose-xpress/</link>
		
		<dc:creator><![CDATA[jo@rubiconmarketing.net]]></dc:creator>
		<pubDate>Mon, 30 Oct 2017 11:27:20 +0000</pubDate>
				<guid isPermaLink="false">https://bar.co.uk/?post_type=avada_portfolio&#038;p=25839</guid>

					<description><![CDATA[<p>MDBA Missiles choose Xpress   The project involved the re-organisation of 1,200 staff across 6 buildings within the same campus at Stevenage, with one phase requiring an 820 person move over one weekend. It also included the re-organisation of 3 industrial units containing laboratories and missile test areas, as well as the installation  [...]</p>
<p>The post <a href="https://bar.co.uk/portfolio-items/mdba-missiles-choose-xpress/">MDBA Missiles choose Xpress</a> appeared first on <a href="https://bar.co.uk">British Association of Removers</a>.</p>
]]></description>
										<content:encoded><![CDATA[<div class="fusion-fullwidth fullwidth-box fusion-builder-row-2 nonhundred-percent-fullwidth non-hundred-percent-height-scrolling" style="--awb-border-radius-top-left:0px;--awb-border-radius-top-right:0px;--awb-border-radius-bottom-right:0px;--awb-border-radius-bottom-left:0px;--awb-flex-wrap:wrap;" ><div class="fusion-builder-row fusion-row"><div class="fusion-layout-column fusion_builder_column fusion-builder-column-3 fusion_builder_column_1_1 1_1 fusion-one-full fusion-column-first fusion-column-last" style="--awb-bg-size:cover;"><div class="fusion-column-wrapper fusion-flex-column-wrapper-legacy"><div class="fusion-title title fusion-title-2 fusion-sep-none fusion-title-text fusion-title-size-one" style="--awb-margin-top-small:0px;--awb-margin-right-small:0px;--awb-margin-bottom-small:20px;--awb-margin-left-small:0px;"><h1 class="fusion-title-heading title-heading-left fusion-responsive-typography-calculated" style="margin:0;--fontSize:38;line-height:1.11;"><h1>MDBA Missiles choose Xpress</h1></h1></div><div class="fusion-clearfix"></div></div></div><div class="fusion-layout-column fusion_builder_column fusion-builder-column-4 fusion_builder_column_2_3 2_3 fusion-two-third fusion-column-first" style="--awb-bg-size:cover;--awb-margin-bottom:0px;width:65.3333%; margin-right: 4%;"><div class="fusion-column-wrapper fusion-flex-column-wrapper-legacy"><div class="fusion-text fusion-text-4"><p style="font-size: 18px;">The project involved the re-organisation of 1,200 staff across 6 buildings within the same campus at Stevenage, with one phase requiring an 820 person move over one weekend. It also included the re-organisation of 3 industrial units containing laboratories and missile test areas, as well as the installation of over 200 specialist ESD work benches.</p>
<h2>Project Planning</h2>
<p>Xpress received an outline move description from the MBDA Project Manager and attended their site for an initial briefing.</p>
<p>Surveys of the relevant areas involved in the relocation, including all crate requirements were carried out shortly after.</p>
<p>Once we had received a final schedule of service requirements we completed all quotation requirements and forwarded to them MBDA. We then organised regular project meetings with all contractors involved in order to co-ordinate the planning, as well as carrying out interviews and briefings with all move co-ordinators.</p>
</div><div class="fusion-image-element fusion-image-align-center in-legacy-container" style="text-align:center;--awb-caption-title-font-family:var(--h2_typography-font-family);--awb-caption-title-font-weight:var(--h2_typography-font-weight);--awb-caption-title-font-style:var(--h2_typography-font-style);--awb-caption-title-size:var(--h2_typography-font-size);--awb-caption-title-transform:var(--h2_typography-text-transform);--awb-caption-title-line-height:var(--h2_typography-line-height);--awb-caption-title-letter-spacing:var(--h2_typography-letter-spacing);"><div class="imageframe-align-center"><span class=" fusion-imageframe imageframe-none imageframe-3 hover-type-none"><img decoding="async" width="720" height="480" title="xpress-missiles" src="https://bar.co.uk/wp-content/uploads/2018/07/xpress-missiles.jpg" alt class="img-responsive wp-image-25767" srcset="https://bar.co.uk/wp-content/uploads/2018/07/xpress-missiles-200x133.jpg 200w, https://bar.co.uk/wp-content/uploads/2018/07/xpress-missiles-400x267.jpg 400w, https://bar.co.uk/wp-content/uploads/2018/07/xpress-missiles-600x400.jpg 600w, https://bar.co.uk/wp-content/uploads/2018/07/xpress-missiles.jpg 720w" sizes="(max-width: 767px) 100vw, 720px" /></span></div></div><div class="fusion-sep-clear"></div><div class="fusion-separator fusion-full-width-sep" style="margin-left: auto;margin-right: auto;margin-top:30px;width:100%;"></div><div class="fusion-sep-clear"></div><div class="fusion-text fusion-text-5"><p>Occupation Profiles were constructed to identify all staff and equipment moving, including identifying desk heights to be raised and lowered. Controlled CAD plans for new areas including full numbering systems were prepared and final move schedules were also prepared.</p>
<p>Once final layout plans were issued a coloured labelling system was agreed, and pre-printed move labels were supplied with a bespoke Move Guide for all members of MBDA staff involved.</p>
<p>Crate deliveries were booked in, and labels, move guides and security seals were delivered to site and distributed accordingly.</p>
<p>All access routes and work areas were identified, and the required risk assessments were formulated and signed off by MBDA’s Safety and Health Executive Team prior to the relevant move dates, final sign off of areas was carried out on the day prior to move commencement</p>
<h2>Move Execution</h2>
<p>Xpress set up a move control centre in conjunction with the Information Management Team from MBDA, where on-site issues could be reported, broadcast to relevant parties and actions set in place to rectify where necessary.</p>
<p>Each phase was carried out as follows:</p>
<ul>
<li>Attend site with crews materials and vehicles</li>
<li>Carry out a full move briefing (all staff already held induction certificates)</li>
<li>Place all move warning signage</li>
<li>Cordon off relevant work areas</li>
<li>Lay building protection to all affected areas</li>
<li>Distribute all IT crates and bubble wrap whilst IT engineers decommission equipment</li>
<li>Pack all IT and move to holding areas</li>
<li>Dismantle furniture and screens as required</li>
<li>Move all relevant furniture to new locations</li>
<li>Lay out furniture to new floor plans including desk raising and lowering</li>
<li>Move and unpack IT equipment and place onto desks</li>
<li>Relocate filing cabinets whilst engineers recommission IT equipment</li>
<li>Deliver all seating to final locations</li>
<li>Deliver all pedestals once engineers have completed recommissioning</li>
<li>Sign off IT with IT engineers</li>
<li>Move and place all filing and desk content crates</li>
<li>Move any surplus items and furniture to storage</li>
<li>Sign off move with MBDA Project Team</li>
<li>Place ‘move snagging boards’ in all areas</li>
<li>Remove all materials and moving equipment from site<strong> </strong></li>
</ul>
<h2>Post Move Support<strong><br />
</strong></h2>
<ul>
<li>Attend site on first working day after move and sign off each area with the Client Project Manager and Departmental Representative</li>
<li>Brief on site crew to assist staff in crate unpacking/removal and general assistance</li>
<li>Set up ‘Move Help Desk’ to collate any information on Move Snagging Boards and action relevant technician to rectify problem</li>
<li>Formulate any additional move schedule requirements and book in crew to complete</li>
<li>Collect all crates from site</li>
</ul>
<h2>Post Move Evaluation</h2>
<p>A post move evaluation and ‘lessons learnt’ forum with MBDA Project Team was set up after each move where any amendments to SLA’s as a result of forum findings were highlighted.</p>
<p>Xpress also carried out an internal review to evaluate performance and make improvements as necessary which was communicated to all relevant staff.</p>
</div><div class="fusion-clearfix"></div></div></div><div class="fusion-layout-column fusion_builder_column fusion-builder-column-5 fusion_builder_column_1_3 1_3 fusion-one-third fusion-column-last" style="--awb-padding-top:20px;--awb-padding-right:20px;--awb-padding-bottom:20px;--awb-padding-left:20px;--awb-bg-size:cover;--awb-border-color:#eaeaea;--awb-border-top:1px;--awb-border-right:1px;--awb-border-bottom:1px;--awb-border-left:1px;--awb-border-style:solid;width:30.6666%;"><div class="fusion-column-wrapper fusion-flex-column-wrapper-legacy"><div class="fusion-image-element fusion-image-align-center in-legacy-container" style="text-align:center;--awb-caption-title-font-family:var(--h2_typography-font-family);--awb-caption-title-font-weight:var(--h2_typography-font-weight);--awb-caption-title-font-style:var(--h2_typography-font-style);--awb-caption-title-size:var(--h2_typography-font-size);--awb-caption-title-transform:var(--h2_typography-text-transform);--awb-caption-title-line-height:var(--h2_typography-line-height);--awb-caption-title-letter-spacing:var(--h2_typography-letter-spacing);"><div class="imageframe-align-center"><span class=" fusion-imageframe imageframe-none imageframe-4 hover-type-none"><img decoding="async" width="350" height="63" title="xpress-logo" src="https://bar.co.uk/wp-content/uploads/2017/03/xpress-logo.jpg" alt class="img-responsive wp-image-25741" srcset="https://bar.co.uk/wp-content/uploads/2017/03/xpress-logo-200x36.jpg 200w, https://bar.co.uk/wp-content/uploads/2017/03/xpress-logo.jpg 350w" sizes="(max-width: 767px) 100vw, 350px" /></span></div></div><div class="fusion-sep-clear"></div><div class="fusion-separator fusion-full-width-sep" style="margin-left: auto;margin-right: auto;margin-top:30px;width:100%;"></div><div class="fusion-sep-clear"></div><div class="fusion-text fusion-text-6"><p style="text-align: center;"><strong>Xpress Relocation Ltd</strong></p>
<p style="text-align: center;"><a href="https://www.xpressrelocation.co.uk">www.xpressrelocation.co.uk</a><br />
<strong><br />
Telephone:</strong><br />
01908 374 999</p>
<p style="text-align: center;"><strong>Email:</strong><br />
<a href="mailto:sales@xpressrelocation.co.uk">sales@xpressrelocation.co.uk</a></p>
</div><div class="fusion-clearfix"></div></div></div></div></div>
<p>The post <a href="https://bar.co.uk/portfolio-items/mdba-missiles-choose-xpress/">MDBA Missiles choose Xpress</a> appeared first on <a href="https://bar.co.uk">British Association of Removers</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Premier Moves relocate 200 Staff at The Royal College of Surgeons in one day!</title>
		<link>https://bar.co.uk/portfolio-items/premier-moves-relocate-200-staff-at-the-royal-college-of-surgeons-in-one-day/</link>
		
		<dc:creator><![CDATA[jo@rubiconmarketing.net]]></dc:creator>
		<pubDate>Mon, 23 Oct 2017 10:17:13 +0000</pubDate>
				<guid isPermaLink="false">https://bar.co.uk/?post_type=avada_portfolio&#038;p=25836</guid>

					<description><![CDATA[<p>Premier Moves relocate 200 Staff at The Royal College of Surgeons in one day!   As part of planned modernisation of the Royal College of Surgeons, 200 staff and various specialist equipment was to move from a listed building into a new property. A competitive tender from 4 companies resulted in a contract  [...]</p>
<p>The post <a href="https://bar.co.uk/portfolio-items/premier-moves-relocate-200-staff-at-the-royal-college-of-surgeons-in-one-day/">Premier Moves relocate 200 Staff at The Royal College of Surgeons in one day!</a> appeared first on <a href="https://bar.co.uk">British Association of Removers</a>.</p>
]]></description>
										<content:encoded><![CDATA[<div class="fusion-fullwidth fullwidth-box fusion-builder-row-3 nonhundred-percent-fullwidth non-hundred-percent-height-scrolling" style="--awb-border-radius-top-left:0px;--awb-border-radius-top-right:0px;--awb-border-radius-bottom-right:0px;--awb-border-radius-bottom-left:0px;--awb-flex-wrap:wrap;" ><div class="fusion-builder-row fusion-row"><div class="fusion-layout-column fusion_builder_column fusion-builder-column-6 fusion_builder_column_1_1 1_1 fusion-one-full fusion-column-first fusion-column-last" style="--awb-bg-size:cover;"><div class="fusion-column-wrapper fusion-flex-column-wrapper-legacy"><div class="fusion-title title fusion-title-3 fusion-sep-none fusion-title-text fusion-title-size-one" style="--awb-margin-top-small:0px;--awb-margin-right-small:0px;--awb-margin-bottom-small:20px;--awb-margin-left-small:0px;"><h1 class="fusion-title-heading title-heading-left fusion-responsive-typography-calculated" style="margin:0;--fontSize:38;line-height:1.11;"><h1>Premier Moves relocate 200 Staff at The Royal College of Surgeons in one day!</h1></h1></div><div class="fusion-clearfix"></div></div></div><div class="fusion-layout-column fusion_builder_column fusion-builder-column-7 fusion_builder_column_2_3 2_3 fusion-two-third fusion-column-first" style="--awb-bg-size:cover;--awb-margin-bottom:0px;width:65.3333%; margin-right: 4%;"><div class="fusion-column-wrapper fusion-flex-column-wrapper-legacy"><div class="fusion-text fusion-text-7"><p style="font-size: 18px;">As part of planned modernisation of the Royal College of Surgeons, 200 staff and various specialist equipment was to move from a listed building into a new property. A competitive tender from 4 companies resulted in a contract for Premier Workplace Services to fulfil the move.</p>
<h2>Project Solution</h2>
<p>Premier liaised with the RCS estate team and partners Lendlease to plan a detailed project move plan. A full audit of all items was completed by the team, with Premier supplying crates staff to securely pack all items to be moved.</p>
<p>Premier decommissioned the IT and communications systems and dismantled and packaged furniture items. The furniture removals required specialist care, due to the listed building environment, narrow corridors and original features. Protection was used to prevent damage to the interior, and items were moved using the old lift system. Heavy objects included safes, a press and a full-sized snooker table.</p>
</div><div class="fusion-image-element fusion-image-align-center in-legacy-container" style="text-align:center;--awb-caption-title-font-family:var(--h2_typography-font-family);--awb-caption-title-font-weight:var(--h2_typography-font-weight);--awb-caption-title-font-style:var(--h2_typography-font-style);--awb-caption-title-size:var(--h2_typography-font-size);--awb-caption-title-transform:var(--h2_typography-text-transform);--awb-caption-title-line-height:var(--h2_typography-line-height);--awb-caption-title-letter-spacing:var(--h2_typography-letter-spacing);"><div class="imageframe-align-center"><span class=" fusion-imageframe imageframe-none imageframe-5 hover-type-none"><img decoding="async" width="720" height="480" title="premier-rcos" src="https://bar.co.uk/wp-content/uploads/2018/07/premier-rcos.jpg" alt class="img-responsive wp-image-25755" srcset="https://bar.co.uk/wp-content/uploads/2018/07/premier-rcos-200x133.jpg 200w, https://bar.co.uk/wp-content/uploads/2018/07/premier-rcos-400x267.jpg 400w, https://bar.co.uk/wp-content/uploads/2018/07/premier-rcos-600x400.jpg 600w, https://bar.co.uk/wp-content/uploads/2018/07/premier-rcos.jpg 720w" sizes="(max-width: 767px) 100vw, 720px" /></span></div></div><div class="fusion-sep-clear"></div><div class="fusion-separator fusion-full-width-sep" style="margin-left: auto;margin-right: auto;margin-top:30px;width:100%;"></div><div class="fusion-sep-clear"></div><div class="fusion-text fusion-text-8"><p>Once in situ in the new building, the Premier team worked together with the moves managers to relocate and unpack the furniture, recommissioning the IT and comms systems as per the detailed plans. The actual move was completed during one day, with Premier organising sustainable clearance of the vacated property as well as cleaning services. All waste items not suitable for remanufacture or reuse were recycled according to the Environment Agency’s WEEE recycling hierarchy.</p>
<h2>Services Provided</h2>
<ul>
<li>200 staff move</li>
<li>Crate Supply</li>
<li>Sustainable office clearance</li>
<li>IT Decom/Recom</li>
<li>Furniture donation via The Giving Back Project</li>
<li>Furniture dismantle/rebuild</li>
<li>Provision of 40+ remanufactured desks, office chairs, tables and lockers</li>
</ul>
<blockquote>
<p>“Friday’s move went really smoothly. Tim and his team did a great job so please pass on my thanks. This place is a real warren with geriatric lifts, so they did amazingly well to sort everything out over the last few weeks. It feels really nice to finally have all the moves under our belt at long last &#8211; until 2020 anyway!” &#8211; Facilities Manager</p>
</blockquote>
</div><div class="fusion-clearfix"></div></div></div><div class="fusion-layout-column fusion_builder_column fusion-builder-column-8 fusion_builder_column_1_3 1_3 fusion-one-third fusion-column-last" style="--awb-padding-top:20px;--awb-padding-right:20px;--awb-padding-bottom:20px;--awb-padding-left:20px;--awb-bg-size:cover;--awb-border-color:#eaeaea;--awb-border-top:1px;--awb-border-right:1px;--awb-border-bottom:1px;--awb-border-left:1px;--awb-border-style:solid;width:30.6666%;"><div class="fusion-column-wrapper fusion-flex-column-wrapper-legacy"><div class="fusion-image-element fusion-image-align-center in-legacy-container" style="text-align:center;--awb-caption-title-font-family:var(--h2_typography-font-family);--awb-caption-title-font-weight:var(--h2_typography-font-weight);--awb-caption-title-font-style:var(--h2_typography-font-style);--awb-caption-title-size:var(--h2_typography-font-size);--awb-caption-title-transform:var(--h2_typography-text-transform);--awb-caption-title-line-height:var(--h2_typography-line-height);--awb-caption-title-letter-spacing:var(--h2_typography-letter-spacing);"><div class="imageframe-align-center"><span class=" fusion-imageframe imageframe-none imageframe-6 hover-type-none"><img decoding="async" width="350" height="125" title="premier-logo" src="https://bar.co.uk/wp-content/uploads/2017/03/premier-logo.jpg" alt class="img-responsive wp-image-25735" srcset="https://bar.co.uk/wp-content/uploads/2017/03/premier-logo-200x71.jpg 200w, https://bar.co.uk/wp-content/uploads/2017/03/premier-logo.jpg 350w" sizes="(max-width: 767px) 100vw, 350px" /></span></div></div><div class="fusion-sep-clear"></div><div class="fusion-separator fusion-full-width-sep" style="margin-left: auto;margin-right: auto;margin-top:30px;width:100%;"></div><div class="fusion-sep-clear"></div><div class="fusion-text fusion-text-9"><p style="text-align: center;"><strong>Premier Moves Ltd</strong></p>
<p style="text-align: center;"><a href="http://www.premierworkplaceservices.co.uk">www.premierworkplaceservices.co.uk</a><br />
<strong><br />
Telephone:</strong><br />
020 8976 2100</p>
<p style="text-align: center;"><strong>Email:</strong><br />
<a href="mailto:info@premierworkplaceservices.co.uk">info@premierworkplaceservices.co.uk</a></p>
</div><div class="fusion-clearfix"></div></div></div></div></div>
<p>The post <a href="https://bar.co.uk/portfolio-items/premier-moves-relocate-200-staff-at-the-royal-college-of-surgeons-in-one-day/">Premier Moves relocate 200 Staff at The Royal College of Surgeons in one day!</a> appeared first on <a href="https://bar.co.uk">British Association of Removers</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Bishops Move: Phase Two of The University of Surrey Library Relocation</title>
		<link>https://bar.co.uk/portfolio-items/bishops-move-phase-two-of-the-university-of-surrey-library-relocation/</link>
		
		<dc:creator><![CDATA[jo@rubiconmarketing.net]]></dc:creator>
		<pubDate>Tue, 17 Oct 2017 10:13:06 +0000</pubDate>
				<guid isPermaLink="false">https://bar.co.uk/?post_type=avada_portfolio&#038;p=25833</guid>

					<description><![CDATA[<p>Bishops Move: Phase Two of The University of Surrey Library Relocation   Bishop’s Move has been a long-standing supplier to the University of Surrey. In 2016, we became involved in the project to update the shelving within the existing library. This initial phase in a multiphased project spanning several years, required the sequential  [...]</p>
<p>The post <a href="https://bar.co.uk/portfolio-items/bishops-move-phase-two-of-the-university-of-surrey-library-relocation/">Bishops Move: Phase Two of The University of Surrey Library Relocation</a> appeared first on <a href="https://bar.co.uk">British Association of Removers</a>.</p>
]]></description>
										<content:encoded><![CDATA[<div class="fusion-fullwidth fullwidth-box fusion-builder-row-4 nonhundred-percent-fullwidth non-hundred-percent-height-scrolling" style="--awb-border-radius-top-left:0px;--awb-border-radius-top-right:0px;--awb-border-radius-bottom-right:0px;--awb-border-radius-bottom-left:0px;--awb-flex-wrap:wrap;" ><div class="fusion-builder-row fusion-row"><div class="fusion-layout-column fusion_builder_column fusion-builder-column-9 fusion_builder_column_1_1 1_1 fusion-one-full fusion-column-first fusion-column-last" style="--awb-bg-size:cover;"><div class="fusion-column-wrapper fusion-flex-column-wrapper-legacy"><div class="fusion-title title fusion-title-4 fusion-sep-none fusion-title-text fusion-title-size-one" style="--awb-margin-top-small:0px;--awb-margin-right-small:0px;--awb-margin-bottom-small:20px;--awb-margin-left-small:0px;"><h1 class="fusion-title-heading title-heading-left fusion-responsive-typography-calculated" style="margin:0;--fontSize:38;line-height:1.11;"><h1>Bishops Move: Phase Two of The University of Surrey Library Relocation</h1></h1></div><div class="fusion-clearfix"></div></div></div><div class="fusion-layout-column fusion_builder_column fusion-builder-column-10 fusion_builder_column_2_3 2_3 fusion-two-third fusion-column-first" style="--awb-bg-size:cover;--awb-margin-bottom:0px;width:65.3333%; margin-right: 4%;"><div class="fusion-column-wrapper fusion-flex-column-wrapper-legacy"><div class="fusion-text fusion-text-10"><p style="font-size: 18px;">Bishop’s Move has been a long-standing supplier to the University of Surrey. In 2016, we became involved in the project to update the shelving within the existing library. This initial phase in a multiphased project spanning several years, required the sequential packing and relocating of 500 linear metres of material off-site to our local storage facility.</p>
<p>Once completed old shelving was removed and new shelving was installed over the summer break. On completion of the installation of the shelving our teams completed the redelivery and unpacking of the collections.</p>
</div><div class="fusion-image-element fusion-image-align-center in-legacy-container" style="text-align:center;--awb-caption-title-font-family:var(--h2_typography-font-family);--awb-caption-title-font-weight:var(--h2_typography-font-weight);--awb-caption-title-font-style:var(--h2_typography-font-style);--awb-caption-title-size:var(--h2_typography-font-size);--awb-caption-title-transform:var(--h2_typography-text-transform);--awb-caption-title-line-height:var(--h2_typography-line-height);--awb-caption-title-letter-spacing:var(--h2_typography-letter-spacing);"><div class="imageframe-align-center"><span class=" fusion-imageframe imageframe-none imageframe-7 hover-type-none"><img decoding="async" width="720" height="480" title="bishopsmove-librarytwo" src="https://bar.co.uk/wp-content/uploads/2018/07/bishopsmove-librarytwo.jpg" alt class="img-responsive wp-image-25763" srcset="https://bar.co.uk/wp-content/uploads/2018/07/bishopsmove-librarytwo-200x133.jpg 200w, https://bar.co.uk/wp-content/uploads/2018/07/bishopsmove-librarytwo-400x267.jpg 400w, https://bar.co.uk/wp-content/uploads/2018/07/bishopsmove-librarytwo-600x400.jpg 600w, https://bar.co.uk/wp-content/uploads/2018/07/bishopsmove-librarytwo.jpg 720w" sizes="(max-width: 767px) 100vw, 720px" /></span></div></div><div class="fusion-sep-clear"></div><div class="fusion-separator fusion-full-width-sep" style="margin-left: auto;margin-right: auto;margin-top:30px;width:100%;"></div><div class="fusion-sep-clear"></div><div class="fusion-text fusion-text-11"><p>In 2017 the scope of the move was significantly increased and the move required the clearance of a much larger area. Bishop’s Move provided an on-site Move Manager liasing with the University Librarians to formulate a programme and manage the teams on a daily basis.</p>
<p>Over a period of 2 weeks in June we packed and relocated 2.5km of materials off site. We also simultaneously relocated a further 3.4km of materials on site and also provided a porterage team to relocate furniture to other areas within the library building.</p>
<p>Following a 12-week building programme Bishop’s Move completed the return relocation of the 2.5km of materials from our warehouse whilst also relocating a further 3.4km of materials internally.</p>
<p>The return move also overlapped with the continued installation of the new shelving which required detailed planning and guaranteed delivery of the movement/unpacking of up to 625 linear metres of material per day to avoid any delays to other contractors.</p>
</div><div class="fusion-clearfix"></div></div></div><div class="fusion-layout-column fusion_builder_column fusion-builder-column-11 fusion_builder_column_1_3 1_3 fusion-one-third fusion-column-last" style="--awb-padding-top:20px;--awb-padding-right:20px;--awb-padding-bottom:20px;--awb-padding-left:20px;--awb-bg-size:cover;--awb-border-color:#eaeaea;--awb-border-top:1px;--awb-border-right:1px;--awb-border-bottom:1px;--awb-border-left:1px;--awb-border-style:solid;width:30.6666%;"><div class="fusion-column-wrapper fusion-flex-column-wrapper-legacy"><div class="fusion-image-element fusion-image-align-center in-legacy-container" style="text-align:center;--awb-caption-title-font-family:var(--h2_typography-font-family);--awb-caption-title-font-weight:var(--h2_typography-font-weight);--awb-caption-title-font-style:var(--h2_typography-font-style);--awb-caption-title-size:var(--h2_typography-font-size);--awb-caption-title-transform:var(--h2_typography-text-transform);--awb-caption-title-line-height:var(--h2_typography-line-height);--awb-caption-title-letter-spacing:var(--h2_typography-letter-spacing);"><div class="imageframe-align-center"><span class=" fusion-imageframe imageframe-none imageframe-8 hover-type-none"><img decoding="async" width="200" height="200" title="bishopsmove-logo" src="https://bar.co.uk/wp-content/uploads/2017/03/bishopsmove-logo.jpg" alt class="img-responsive wp-image-25738" srcset="https://bar.co.uk/wp-content/uploads/2017/03/bishopsmove-logo-66x66.jpg 66w, https://bar.co.uk/wp-content/uploads/2017/03/bishopsmove-logo-150x150.jpg 150w, https://bar.co.uk/wp-content/uploads/2017/03/bishopsmove-logo.jpg 200w" sizes="(max-width: 200px) 100vw, 200px" /></span></div></div><div class="fusion-sep-clear"></div><div class="fusion-separator fusion-full-width-sep" style="margin-left: auto;margin-right: auto;margin-top:30px;width:100%;"></div><div class="fusion-sep-clear"></div><div class="fusion-text fusion-text-12"><p style="text-align: center;"><strong>Bishops Move</strong></p>
<p style="text-align: center;"><a href="https://www.bishopsmove.com">www.bishopsmove.com</a><br />
<strong><br />
Telephone:</strong><br />
020 8391 8222</p>
<p style="text-align: center;"><strong>Email:</strong><br />
<a href="mailto:marketing@bishopsmove.com">marketing@bishopsmove.com</a></p>
</div><div class="fusion-clearfix"></div></div></div></div></div>
<p>The post <a href="https://bar.co.uk/portfolio-items/bishops-move-phase-two-of-the-university-of-surrey-library-relocation/">Bishops Move: Phase Two of The University of Surrey Library Relocation</a> appeared first on <a href="https://bar.co.uk">British Association of Removers</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Specialised Movers and The Qatar National Library</title>
		<link>https://bar.co.uk/portfolio-items/specialised-movers-and-the-qatar-national-library/</link>
		
		<dc:creator><![CDATA[jo@rubiconmarketing.net]]></dc:creator>
		<pubDate>Wed, 11 Oct 2017 09:24:22 +0000</pubDate>
				<guid isPermaLink="false">https://bar.co.uk/?post_type=avada_portfolio&#038;p=25811</guid>

					<description><![CDATA[<p>Specialised Movers and The Qatar National Library   Qatar National Library was looking for an experienced Library Specialist to carry out shelving services for their new National Library of Qatar for its move into its permanent home. The work involved shelving, re-shelving and shelf reading; also the moving of shelf library materials (brand  [...]</p>
<p>The post <a href="https://bar.co.uk/portfolio-items/specialised-movers-and-the-qatar-national-library/">Specialised Movers and The Qatar National Library</a> appeared first on <a href="https://bar.co.uk">British Association of Removers</a>.</p>
]]></description>
										<content:encoded><![CDATA[<div class="fusion-fullwidth fullwidth-box fusion-builder-row-5 nonhundred-percent-fullwidth non-hundred-percent-height-scrolling" style="--awb-border-radius-top-left:0px;--awb-border-radius-top-right:0px;--awb-border-radius-bottom-right:0px;--awb-border-radius-bottom-left:0px;--awb-flex-wrap:wrap;" ><div class="fusion-builder-row fusion-row"><div class="fusion-layout-column fusion_builder_column fusion-builder-column-12 fusion_builder_column_1_1 1_1 fusion-one-full fusion-column-first fusion-column-last" style="--awb-bg-size:cover;"><div class="fusion-column-wrapper fusion-flex-column-wrapper-legacy"><div class="fusion-title title fusion-title-5 fusion-sep-none fusion-title-text fusion-title-size-one" style="--awb-margin-top-small:0px;--awb-margin-right-small:0px;--awb-margin-bottom-small:20px;--awb-margin-left-small:0px;"><h1 class="fusion-title-heading title-heading-left fusion-responsive-typography-calculated" style="margin:0;--fontSize:38;line-height:1.11;"><h1>Specialised Movers and The Qatar National Library</h1></h1></div><div class="fusion-clearfix"></div></div></div><div class="fusion-layout-column fusion_builder_column fusion-builder-column-13 fusion_builder_column_2_3 2_3 fusion-two-third fusion-column-first" style="--awb-bg-size:cover;--awb-margin-bottom:0px;width:65.3333%; margin-right: 4%;"><div class="fusion-column-wrapper fusion-flex-column-wrapper-legacy"><div class="fusion-text fusion-text-13"><p style="font-size: 18px;">Qatar National Library was looking for an experienced Library Specialist to carry out shelving services for their new National Library of Qatar for its move into its permanent home.</p>
<p>The work involved shelving, re-shelving and shelf reading; also the moving of shelf library materials (brand new stock) from warehouses in Qatar to the new library building. The shelving services included processing, sorting, shelving according to call numbers, move materials as necessary and perform specific collection support tasks. The estimate at this stage was that there would be up to 752, 206 items to shelve during the contract period.</p>
<h2>The Systems</h2>
<p>All items (bookstock) were to be arranged according to the classification schemes used by the library.</p>
<p>Qatar National Library uses the Library Congress Classification (LCC) for its General Non-Fiction Collections and the Dewey Decimal Classification (DDC) for its Children&#8217;s and Young adult Non-Fiction collection.</p>
</div><div class="fusion-image-carousel fusion-image-carousel-auto fusion-image-carousel-1"><div class="awb-carousel awb-swiper awb-swiper-carousel awb-carousel--carousel awb-swiper-dots-position-bottom" data-layout="carousel" data-autoplay="yes" data-autoplayspeed="2500" data-autoplaypause="no" data-loop="yes" data-columns="1" data-columnsmedium="1" data-columnssmall="1" data-itemmargin="13" data-itemwidth="180" data-touchscroll="no" data-freemode="no" data-imagesize="auto" data-scrollitems="0" data-centeredslides="no" data-rotationangle="50" data-depth="100" data-speed="500" data-shadow="no" data-pagination="bullets" style="--awb-columns:1;"><div class="swiper-wrapper awb-image-carousel-wrapper fusion-flex-align-items-center"><div class="swiper-slide"><div class="fusion-carousel-item-wrapper"><div class="fusion-image-wrapper hover-type-none"><img decoding="async" width="720" height="480" src="https://bar.co.uk/wp-content/uploads/2018/07/specialisedmovers-qatar.jpg" class="attachment-full size-full" alt="" srcset="https://bar.co.uk/wp-content/uploads/2018/07/specialisedmovers-qatar-200x133.jpg 200w, https://bar.co.uk/wp-content/uploads/2018/07/specialisedmovers-qatar-300x200.jpg 300w, https://bar.co.uk/wp-content/uploads/2018/07/specialisedmovers-qatar-400x267.jpg 400w, https://bar.co.uk/wp-content/uploads/2018/07/specialisedmovers-qatar-600x400.jpg 600w, https://bar.co.uk/wp-content/uploads/2018/07/specialisedmovers-qatar.jpg 720w" sizes="(max-width: 720px) 100vw, 720px" /></div></div></div><div class="swiper-slide"><div class="fusion-carousel-item-wrapper"><div class="fusion-image-wrapper hover-type-none"><img decoding="async" width="720" height="480" src="https://bar.co.uk/wp-content/uploads/2018/07/qatar2.jpg" class="attachment-full size-full" alt="" srcset="https://bar.co.uk/wp-content/uploads/2018/07/qatar2-200x133.jpg 200w, https://bar.co.uk/wp-content/uploads/2018/07/qatar2-300x200.jpg 300w, https://bar.co.uk/wp-content/uploads/2018/07/qatar2-400x267.jpg 400w, https://bar.co.uk/wp-content/uploads/2018/07/qatar2-600x400.jpg 600w, https://bar.co.uk/wp-content/uploads/2018/07/qatar2.jpg 720w" sizes="(max-width: 720px) 100vw, 720px" /></div></div></div><div class="swiper-slide"><div class="fusion-carousel-item-wrapper"><div class="fusion-image-wrapper hover-type-none"><img decoding="async" width="720" height="480" src="https://bar.co.uk/wp-content/uploads/2018/07/qatar3.jpg" class="attachment-full size-full" alt="" srcset="https://bar.co.uk/wp-content/uploads/2018/07/qatar3-200x133.jpg 200w, https://bar.co.uk/wp-content/uploads/2018/07/qatar3-300x200.jpg 300w, https://bar.co.uk/wp-content/uploads/2018/07/qatar3-400x267.jpg 400w, https://bar.co.uk/wp-content/uploads/2018/07/qatar3-600x400.jpg 600w, https://bar.co.uk/wp-content/uploads/2018/07/qatar3.jpg 720w" sizes="(max-width: 720px) 100vw, 720px" /></div></div></div><div class="swiper-slide"><div class="fusion-carousel-item-wrapper"><div class="fusion-image-wrapper hover-type-none"><img decoding="async" width="720" height="480" src="https://bar.co.uk/wp-content/uploads/2018/07/qatar4.jpg" class="attachment-full size-full" alt="" srcset="https://bar.co.uk/wp-content/uploads/2018/07/qatar4-200x133.jpg 200w, https://bar.co.uk/wp-content/uploads/2018/07/qatar4-300x200.jpg 300w, https://bar.co.uk/wp-content/uploads/2018/07/qatar4-400x267.jpg 400w, https://bar.co.uk/wp-content/uploads/2018/07/qatar4-600x400.jpg 600w, https://bar.co.uk/wp-content/uploads/2018/07/qatar4.jpg 720w" sizes="(max-width: 720px) 100vw, 720px" /></div></div></div><div class="swiper-slide"><div class="fusion-carousel-item-wrapper"><div class="fusion-image-wrapper hover-type-none"><img decoding="async" width="720" height="480" src="https://bar.co.uk/wp-content/uploads/2018/07/qatar5.jpg" class="attachment-full size-full" alt="" srcset="https://bar.co.uk/wp-content/uploads/2018/07/qatar5-200x133.jpg 200w, https://bar.co.uk/wp-content/uploads/2018/07/qatar5-300x200.jpg 300w, https://bar.co.uk/wp-content/uploads/2018/07/qatar5-400x267.jpg 400w, https://bar.co.uk/wp-content/uploads/2018/07/qatar5-600x400.jpg 600w, https://bar.co.uk/wp-content/uploads/2018/07/qatar5.jpg 720w" sizes="(max-width: 720px) 100vw, 720px" /></div></div></div></div><div class="awb-swiper-button awb-swiper-button-prev"><i class="awb-icon-angle-left" aria-hidden="true"></i></div><div class="awb-swiper-button awb-swiper-button-next"><i class="awb-icon-angle-right" aria-hidden="true"></i></div></div></div><div class="fusion-text fusion-text-14"><h2>The Library</h2>
<p>The National Library of Qatar was established by the Qatar Foundation for Education, Science and research and Community Development. The Library carries out its mission through three functions: National Library, University and Research Library, and a Metropolitan Public Library of the digital age</p>
<p>The National Library function collects and provides access to global knowledge relevant to Qatar and the region. It also collects, preserves and provides access to heritage contents about Qatar and the region. The University and Research Library function supports education and research at all levels by providing printed and digital library materials for students and researchers. The Metropolitan Public Library function delivers library services and information for everyone to enjoy reading, meeting people and become information literate.</p>
<p>The Library is positioned in Education City (in Doha). The building consists of 45,000 square metres and is constructed in one big hall with three main terraces. An advanced sorting system using RFID-integrated with the Qatar National Library management system would help to take part of the collection up to the terraces and additional space for the other parts of the collection would be offered by compact shelving areas (rolling rack – able to accommodate over 1,000,000 items as stocks grow).</p>
<p>Simply put, this is the National Library of Qatar, a hub of learning, the centre of education and possibly one of the most important buildings in the country of Qatar</p>
<h2>The Job</h2>
<p>An initial inspection/survey of the Library, by Group General Manager Rob Townroe and Senior Project Manager Paul Simpson, worked to the planned schedule of this job beginning in 3 months time; but whilst in Qatar they were asked if this could be brought forward to start in the next 2 weeks!</p>
<p>Within 10 days Specialised Movers had sent a project management team to the Library. The team consisted of a senior project manager Paul Simpson, Group Training Manager Sean Royle and several Move Managers. The duration of the project was to take place over 15 weeks, and credit to our team they prepared themselves to live in Doha, Qatar working on the project for the full term (albeit they were housed in 4/5* accommodation, provided with transport, and treated tremendously well by all parties associated with the National Library!).</p>
<p>The team created the processes required to get the stock on the shelves, using a local team of 25 operatives and endless trucks supplied by a company in Doha, Qatar. In many ways the setting up of the processes and procedures for the move were similar to creating a type of manufacturing plant from scratch. The local operatives had to be trained in Library Classification systems and how to use the internal conveyor belt systems, and sorting machines. The local transport company had to get the stock to the library in a &#8220;Just-in-time&#8221; approach, relying on every part of the process working in synergy to make this whole process run smoothly, efficiently and to schedule.</p>
<p>In addition to all the external pressures of getting all parties to work together, there was the added pressures of daily book targets, Quality control and a Library Project Manager auditing and reporting on every aspect of the move.</p>
<p>Two weeks before the end of the of the scheduled move, all books were on shelves, in order, and completed to a satisfaction rate of 99.9% (they weren’t allowed to give 100%!). Our crew used the extra time for further quality controls and any additional works they could find to assist the Library Projects.</p>
<h2>Back Home</h2>
<p>When our crew returned, they each expressed immense pride in their achievements, but also in being associated with such an important project. Their time in Qatar was enriching &#8211; living in a different country, learning about different cultures and working with people from all over the world. They loved the country, the food and most of all the people.</p>
<p>Returning to the UK on a rainy afternoon, they still had smiles on their faces. Paul, our senior project manager (originally from Barnsley), said that it may be cold and wet, but it’s still better than a temperature of 54 degrees, where even a swim in the sea is like taking a hot bath!</p>
</div><div class="fusion-clearfix"></div></div></div><div class="fusion-layout-column fusion_builder_column fusion-builder-column-14 fusion_builder_column_1_3 1_3 fusion-one-third fusion-column-last" style="--awb-padding-top:20px;--awb-padding-right:20px;--awb-padding-bottom:20px;--awb-padding-left:20px;--awb-bg-size:cover;--awb-border-color:#eaeaea;--awb-border-top:1px;--awb-border-right:1px;--awb-border-bottom:1px;--awb-border-left:1px;--awb-border-style:solid;width:30.6666%;"><div class="fusion-column-wrapper fusion-flex-column-wrapper-legacy"><div class="fusion-image-element fusion-image-align-center in-legacy-container" style="text-align:center;--awb-caption-title-font-family:var(--h2_typography-font-family);--awb-caption-title-font-weight:var(--h2_typography-font-weight);--awb-caption-title-font-style:var(--h2_typography-font-style);--awb-caption-title-size:var(--h2_typography-font-size);--awb-caption-title-transform:var(--h2_typography-text-transform);--awb-caption-title-line-height:var(--h2_typography-line-height);--awb-caption-title-letter-spacing:var(--h2_typography-letter-spacing);"><div class="imageframe-align-center"><span class=" fusion-imageframe imageframe-none imageframe-9 hover-type-none"><img decoding="async" width="350" height="120" title="specialised-logo" src="https://bar.co.uk/wp-content/uploads/2018/07/specialised-logo.jpg" alt class="img-responsive wp-image-25771" srcset="https://bar.co.uk/wp-content/uploads/2018/07/specialised-logo-200x69.jpg 200w, https://bar.co.uk/wp-content/uploads/2018/07/specialised-logo.jpg 350w" sizes="(max-width: 767px) 100vw, 350px" /></span></div></div><div class="fusion-sep-clear"></div><div class="fusion-separator fusion-full-width-sep" style="margin-left: auto;margin-right: auto;margin-top:30px;width:100%;"></div><div class="fusion-sep-clear"></div><div class="fusion-text fusion-text-15"><p style="text-align: center;"><strong>Specialised Movers</strong></p>
<p style="text-align: center;"><a href="https://www.specialisedmovers.com">www.specialisedmovers.com</a><br />
<strong><br />
Telephone:</strong><br />
0114 2611183</p>
<p style="text-align: center;"><strong>Email:</strong><br />
<a href="mailto:services@specialisedmovers.com">services@specialisedmovers.com</a></p>
</div><div class="fusion-clearfix"></div></div></div></div></div>
<p>The post <a href="https://bar.co.uk/portfolio-items/specialised-movers-and-the-qatar-national-library/">Specialised Movers and The Qatar National Library</a> appeared first on <a href="https://bar.co.uk">British Association of Removers</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Johnsons Move the Hampshire Office of the Police and Crime Commissioner</title>
		<link>https://bar.co.uk/portfolio-items/johnsons-move-the-hampshire-office-of-the-police-and-crime-commissioner/</link>
		
		<dc:creator><![CDATA[jo@rubiconmarketing.net]]></dc:creator>
		<pubDate>Thu, 21 Sep 2017 09:22:51 +0000</pubDate>
				<guid isPermaLink="false">https://bar.co.uk/?post_type=avada_portfolio&#038;p=25808</guid>

					<description><![CDATA[<p>Johnsons Move the Hampshire Office of the Police and Crime Commissioner   Due to our extensive experience in providing move management consultancy and strategy services; from January to April 2017, Johnsons provided the OPCC with a bespoke service by tailor making and delivering a move management and relocation plan.   Our Head  [...]</p>
<p>The post <a href="https://bar.co.uk/portfolio-items/johnsons-move-the-hampshire-office-of-the-police-and-crime-commissioner/">Johnsons Move the Hampshire Office of the Police and Crime Commissioner</a> appeared first on <a href="https://bar.co.uk">British Association of Removers</a>.</p>
]]></description>
										<content:encoded><![CDATA[<div class="fusion-fullwidth fullwidth-box fusion-builder-row-6 nonhundred-percent-fullwidth non-hundred-percent-height-scrolling" style="--awb-border-radius-top-left:0px;--awb-border-radius-top-right:0px;--awb-border-radius-bottom-right:0px;--awb-border-radius-bottom-left:0px;--awb-flex-wrap:wrap;" ><div class="fusion-builder-row fusion-row"><div class="fusion-layout-column fusion_builder_column fusion-builder-column-15 fusion_builder_column_1_1 1_1 fusion-one-full fusion-column-first fusion-column-last" style="--awb-bg-size:cover;"><div class="fusion-column-wrapper fusion-flex-column-wrapper-legacy"><div class="fusion-title title fusion-title-6 fusion-sep-none fusion-title-text fusion-title-size-one" style="--awb-margin-top-small:0px;--awb-margin-right-small:0px;--awb-margin-bottom-small:20px;--awb-margin-left-small:0px;"><h1 class="fusion-title-heading title-heading-left fusion-responsive-typography-calculated" style="margin:0;--fontSize:38;line-height:1.11;"><h1>Johnsons Move the Hampshire Office of the Police and Crime Commissioner</h1></h1></div><div class="fusion-clearfix"></div></div></div><div class="fusion-layout-column fusion_builder_column fusion-builder-column-16 fusion_builder_column_2_3 2_3 fusion-two-third fusion-column-first" style="--awb-bg-size:cover;--awb-margin-bottom:0px;width:65.3333%; margin-right: 4%;"><div class="fusion-column-wrapper fusion-flex-column-wrapper-legacy"><div class="fusion-text fusion-text-16"><p style="font-size: 18px;">Due to our extensive experience in providing move management consultancy and strategy services; from January to April 2017, Johnsons provided the OPCC with a bespoke service by tailor making and delivering a move management and relocation plan.</p>
</div><div class="fusion-image-element fusion-image-align-center in-legacy-container" style="text-align:center;--awb-caption-title-font-family:var(--h2_typography-font-family);--awb-caption-title-font-weight:var(--h2_typography-font-weight);--awb-caption-title-font-style:var(--h2_typography-font-style);--awb-caption-title-size:var(--h2_typography-font-size);--awb-caption-title-transform:var(--h2_typography-text-transform);--awb-caption-title-line-height:var(--h2_typography-line-height);--awb-caption-title-letter-spacing:var(--h2_typography-letter-spacing);"><div class="imageframe-align-center"><span class=" fusion-imageframe imageframe-none imageframe-10 hover-type-none"><img decoding="async" width="720" height="480" title="johnsons-police" src="https://bar.co.uk/wp-content/uploads/2018/07/johnsons-police.jpg" alt class="img-responsive wp-image-25765" srcset="https://bar.co.uk/wp-content/uploads/2018/07/johnsons-police-200x133.jpg 200w, https://bar.co.uk/wp-content/uploads/2018/07/johnsons-police-400x267.jpg 400w, https://bar.co.uk/wp-content/uploads/2018/07/johnsons-police-600x400.jpg 600w, https://bar.co.uk/wp-content/uploads/2018/07/johnsons-police.jpg 720w" sizes="(max-width: 767px) 100vw, 720px" /></span></div></div><div class="fusion-sep-clear"></div><div class="fusion-separator fusion-full-width-sep" style="margin-left: auto;margin-right: auto;margin-top:30px;width:100%;"></div><div class="fusion-sep-clear"></div><div class="fusion-text fusion-text-17"><p>Our Head of Projects allocated a dedicated Move Manager to this project, who liaised with the OPCC to draw up a timetable which suited all key stakeholders involved in the project. Our approach anticipated that our teams would be expected to complete the tasks listed below:</p>
<ul>
<li>File audits with updated reports/spreadsheets for all locations</li>
<li>Confirmation of items that might not yet have been captured to be relocated</li>
<li>Review of storage and assistance with decluttering</li>
<li>Attendance at project meetings <em>(once every two weeks, which increased nearer to the time of the moves)</em></li>
<li>Putting together a relocation schedule in conjunction with OPCC key stakeholder requirements</li>
<li>Relocate sensitive confidential files and items following police security guidelines</li>
</ul>
<p>The brief was to relocate approximately 340 people to the new site from 4 locations across the north of Hampshire with minimum disruption to operational business. There were a number of moves that took place over a three week period to allow teams to settle in before the next move.</p>
<h2>Result</h2>
<p>The flexibility of our move management team proved to be advantageous for the OPCC as we were able to offer a dynamic approach to their service requirements. The challenging scope meant our Move Manager worked directly with the OPCC’s Project Lead to ensure all works were carried out in accordance with the scope and any changes which needed to be made were done so with as little disruption to the overall move programme and the operational business as possible.</p>
</div><div class="fusion-clearfix"></div></div></div><div class="fusion-layout-column fusion_builder_column fusion-builder-column-17 fusion_builder_column_1_3 1_3 fusion-one-third fusion-column-last" style="--awb-padding-top:20px;--awb-padding-right:20px;--awb-padding-bottom:20px;--awb-padding-left:20px;--awb-bg-size:cover;--awb-border-color:#eaeaea;--awb-border-top:1px;--awb-border-right:1px;--awb-border-bottom:1px;--awb-border-left:1px;--awb-border-style:solid;width:30.6666%;"><div class="fusion-column-wrapper fusion-flex-column-wrapper-legacy"><div class="fusion-image-element fusion-image-align-center in-legacy-container" style="text-align:center;--awb-caption-title-font-family:var(--h2_typography-font-family);--awb-caption-title-font-weight:var(--h2_typography-font-weight);--awb-caption-title-font-style:var(--h2_typography-font-style);--awb-caption-title-size:var(--h2_typography-font-size);--awb-caption-title-transform:var(--h2_typography-text-transform);--awb-caption-title-line-height:var(--h2_typography-line-height);--awb-caption-title-letter-spacing:var(--h2_typography-letter-spacing);"><div class="imageframe-align-center"><span class=" fusion-imageframe imageframe-none imageframe-11 hover-type-none"><img decoding="async" width="350" height="132" title="johnsons-logo" src="https://bar.co.uk/wp-content/uploads/2017/03/johnsons-logo.jpg" alt class="img-responsive wp-image-25742" srcset="https://bar.co.uk/wp-content/uploads/2017/03/johnsons-logo-200x75.jpg 200w, https://bar.co.uk/wp-content/uploads/2017/03/johnsons-logo.jpg 350w" sizes="(max-width: 767px) 100vw, 350px" /></span></div></div><div class="fusion-sep-clear"></div><div class="fusion-separator fusion-full-width-sep" style="margin-left: auto;margin-right: auto;margin-top:30px;width:100%;"></div><div class="fusion-sep-clear"></div><div class="fusion-text fusion-text-18"><p style="text-align: center;"><strong>Johnsons Moving Services</strong></p>
<p style="text-align: center;"><a href="https://www.johnsonshomeremovals.co.uk">www.johnsonshomeremovals.co.uk</a><br />
<strong><br />
Telephone:</strong><br />
0808 124 0014</p>
<p style="text-align: center;"><strong>Email:</strong><br />
<a href="mailto:contact@jms.uk.com">contact@jms.uk.com</a></p>
</div><div class="fusion-clearfix"></div></div></div></div></div>
<p>The post <a href="https://bar.co.uk/portfolio-items/johnsons-move-the-hampshire-office-of-the-police-and-crime-commissioner/">Johnsons Move the Hampshire Office of the Police and Crime Commissioner</a> appeared first on <a href="https://bar.co.uk">British Association of Removers</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Bishops Move: Phase one of The University of Surrey Library Relocation</title>
		<link>https://bar.co.uk/portfolio-items/bishops-move-phase-one-of-the-university-of-surrey-library-relocation/</link>
		
		<dc:creator><![CDATA[jo@rubiconmarketing.net]]></dc:creator>
		<pubDate>Wed, 16 Aug 2017 09:13:57 +0000</pubDate>
				<guid isPermaLink="false">https://bar.co.uk/?post_type=avada_portfolio&#038;p=25806</guid>

					<description><![CDATA[<p>Bishops Move: Phase one of The University of Surrey Library Relocation   The University of Surrey is currently completing a multi-phased refurbishment of its library in the George Edward Building on campus. The project is being completed over several summers to minimise disruption to the students and the restricted access to the library  [...]</p>
<p>The post <a href="https://bar.co.uk/portfolio-items/bishops-move-phase-one-of-the-university-of-surrey-library-relocation/">Bishops Move: Phase one of The University of Surrey Library Relocation</a> appeared first on <a href="https://bar.co.uk">British Association of Removers</a>.</p>
]]></description>
										<content:encoded><![CDATA[<div class="fusion-fullwidth fullwidth-box fusion-builder-row-7 nonhundred-percent-fullwidth non-hundred-percent-height-scrolling" style="--awb-border-radius-top-left:0px;--awb-border-radius-top-right:0px;--awb-border-radius-bottom-right:0px;--awb-border-radius-bottom-left:0px;--awb-flex-wrap:wrap;" ><div class="fusion-builder-row fusion-row"><div class="fusion-layout-column fusion_builder_column fusion-builder-column-18 fusion_builder_column_1_1 1_1 fusion-one-full fusion-column-first fusion-column-last" style="--awb-bg-size:cover;"><div class="fusion-column-wrapper fusion-flex-column-wrapper-legacy"><div class="fusion-title title fusion-title-7 fusion-sep-none fusion-title-text fusion-title-size-one" style="--awb-margin-top-small:0px;--awb-margin-right-small:0px;--awb-margin-bottom-small:20px;--awb-margin-left-small:0px;"><h1 class="fusion-title-heading title-heading-left fusion-responsive-typography-calculated" style="margin:0;--fontSize:38;line-height:1.11;"><h1>Bishops Move: Phase one of The University of Surrey Library Relocation</h1></h1></div><div class="fusion-clearfix"></div></div></div><div class="fusion-layout-column fusion_builder_column fusion-builder-column-19 fusion_builder_column_2_3 2_3 fusion-two-third fusion-column-first" style="--awb-bg-size:cover;--awb-margin-bottom:0px;width:65.3333%; margin-right: 4%;"><div class="fusion-column-wrapper fusion-flex-column-wrapper-legacy"><div class="fusion-text fusion-text-19"><p style="font-size: 18px;">The University of Surrey is currently completing a multi-phased refurbishment of its library in the George Edward Building on campus. The project is being completed over several summers to minimise disruption to the students and the restricted access to the library collections whilst the works are completed.</p>
<h2>Challenges</h2>
<p>In 2016 Bishops Move were appointed to complete the sequential packing and movement of 500 linear metres of materials to our local storage facility whilst old shelving was removed and new shelving was installed to increase capacity.</p>
</div><div class="fusion-image-element fusion-image-align-center in-legacy-container" style="text-align:center;--awb-caption-title-font-family:var(--h2_typography-font-family);--awb-caption-title-font-weight:var(--h2_typography-font-weight);--awb-caption-title-font-style:var(--h2_typography-font-style);--awb-caption-title-size:var(--h2_typography-font-size);--awb-caption-title-transform:var(--h2_typography-text-transform);--awb-caption-title-line-height:var(--h2_typography-line-height);--awb-caption-title-letter-spacing:var(--h2_typography-letter-spacing);"><div class="imageframe-align-center"><span class=" fusion-imageframe imageframe-none imageframe-12 hover-type-none"><img decoding="async" width="720" height="480" title="bishopsmove-libraryone" src="https://bar.co.uk/wp-content/uploads/2018/07/bishopsmove-libraryone.jpg" alt class="img-responsive wp-image-25759" srcset="https://bar.co.uk/wp-content/uploads/2018/07/bishopsmove-libraryone-200x133.jpg 200w, https://bar.co.uk/wp-content/uploads/2018/07/bishopsmove-libraryone-400x267.jpg 400w, https://bar.co.uk/wp-content/uploads/2018/07/bishopsmove-libraryone-600x400.jpg 600w, https://bar.co.uk/wp-content/uploads/2018/07/bishopsmove-libraryone.jpg 720w" sizes="(max-width: 767px) 100vw, 720px" /></span></div></div><div class="fusion-sep-clear"></div><div class="fusion-separator fusion-full-width-sep" style="margin-left: auto;margin-right: auto;margin-top:30px;width:100%;"></div><div class="fusion-sep-clear"></div><div class="fusion-text fusion-text-20"><p>In 2017 Bishops Move were asked to complete a similar but much larger project to allow refurbishment of the 4<sup>th</sup>&amp; 5<sup>th </sup>floors of the library. We were asked to complete the sequential packing and movement of 2750 linear metres of materials to our local storage facility. The move was further increased to include the internal relocation of 3400 linear metres of material to new positions within the library and 200 metres to a store on campus. A further porterage team were also deployed to assist in the movement of library furniture and equipment and dispose/recycle of unwanted furniture due to be replaced.</p>
<p>Bishops Move deployed a team of 26 staff each day with 3 vehicles all supervised and co-ordinated by our on-site Move Manager to complete this move within the 10 day programme. All materials currently in store are due to be returned in early September in time for the commencement of the new term.</p>
</div><div class="fusion-clearfix"></div></div></div><div class="fusion-layout-column fusion_builder_column fusion-builder-column-20 fusion_builder_column_1_3 1_3 fusion-one-third fusion-column-last" style="--awb-padding-top:20px;--awb-padding-right:20px;--awb-padding-bottom:20px;--awb-padding-left:20px;--awb-bg-size:cover;--awb-border-color:#eaeaea;--awb-border-top:1px;--awb-border-right:1px;--awb-border-bottom:1px;--awb-border-left:1px;--awb-border-style:solid;width:30.6666%;"><div class="fusion-column-wrapper fusion-flex-column-wrapper-legacy"><div class="fusion-image-element fusion-image-align-center in-legacy-container" style="text-align:center;--awb-caption-title-font-family:var(--h2_typography-font-family);--awb-caption-title-font-weight:var(--h2_typography-font-weight);--awb-caption-title-font-style:var(--h2_typography-font-style);--awb-caption-title-size:var(--h2_typography-font-size);--awb-caption-title-transform:var(--h2_typography-text-transform);--awb-caption-title-line-height:var(--h2_typography-line-height);--awb-caption-title-letter-spacing:var(--h2_typography-letter-spacing);"><div class="imageframe-align-center"><span class=" fusion-imageframe imageframe-none imageframe-13 hover-type-none"><img decoding="async" width="200" height="200" title="bishopsmove-logo" src="https://bar.co.uk/wp-content/uploads/2017/03/bishopsmove-logo.jpg" alt class="img-responsive wp-image-25738" srcset="https://bar.co.uk/wp-content/uploads/2017/03/bishopsmove-logo-66x66.jpg 66w, https://bar.co.uk/wp-content/uploads/2017/03/bishopsmove-logo-150x150.jpg 150w, https://bar.co.uk/wp-content/uploads/2017/03/bishopsmove-logo.jpg 200w" sizes="(max-width: 200px) 100vw, 200px" /></span></div></div><div class="fusion-sep-clear"></div><div class="fusion-separator fusion-full-width-sep" style="margin-left: auto;margin-right: auto;margin-top:30px;width:100%;"></div><div class="fusion-sep-clear"></div><div class="fusion-text fusion-text-21"><p style="text-align: center;"><strong>Bishop&#8217;s Move</strong></p>
<p style="text-align: center;"><a href="https://www.bishopsmove.com">www.bishopsmove.com</a><br />
<strong><br />
Telephone:</strong><br />
020 8391 8222</p>
<p style="text-align: center;"><strong>Email:</strong><br />
<a href="mailto:enquiries@bishopsmove.com">enquiries@bishopsmove.com</a></p>
</div><div class="fusion-clearfix"></div></div></div></div></div>
<p>The post <a href="https://bar.co.uk/portfolio-items/bishops-move-phase-one-of-the-university-of-surrey-library-relocation/">Bishops Move: Phase one of The University of Surrey Library Relocation</a> appeared first on <a href="https://bar.co.uk">British Association of Removers</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Sykes Global Office Relocation by Purdie Worldwide</title>
		<link>https://bar.co.uk/portfolio-items/sykes-global-office-relocation-by-purdie-worldwide/</link>
		
		<dc:creator><![CDATA[jo@rubiconmarketing.net]]></dc:creator>
		<pubDate>Thu, 20 Jul 2017 09:08:10 +0000</pubDate>
				<guid isPermaLink="false">https://bar.co.uk/?post_type=avada_portfolio&#038;p=25804</guid>

					<description><![CDATA[<p>Sykes Global Office Relocation by Purdie Worldwide   Several years ago we were approached by Sykes Global in the creation of an office space in Galashiels. Fast forward to 2017 and Purdie Worldwide have partnered up again with Sykes Global in their office relocation from Galashiels to Currie House in Edinburgh. Client Requirement  [...]</p>
<p>The post <a href="https://bar.co.uk/portfolio-items/sykes-global-office-relocation-by-purdie-worldwide/">Sykes Global Office Relocation by Purdie Worldwide</a> appeared first on <a href="https://bar.co.uk">British Association of Removers</a>.</p>
]]></description>
										<content:encoded><![CDATA[<div class="fusion-fullwidth fullwidth-box fusion-builder-row-8 nonhundred-percent-fullwidth non-hundred-percent-height-scrolling" style="--awb-border-radius-top-left:0px;--awb-border-radius-top-right:0px;--awb-border-radius-bottom-right:0px;--awb-border-radius-bottom-left:0px;--awb-flex-wrap:wrap;" ><div class="fusion-builder-row fusion-row"><div class="fusion-layout-column fusion_builder_column fusion-builder-column-21 fusion_builder_column_1_1 1_1 fusion-one-full fusion-column-first fusion-column-last" style="--awb-bg-size:cover;"><div class="fusion-column-wrapper fusion-flex-column-wrapper-legacy"><div class="fusion-title title fusion-title-8 fusion-sep-none fusion-title-text fusion-title-size-one" style="--awb-margin-top-small:0px;--awb-margin-right-small:0px;--awb-margin-bottom-small:20px;--awb-margin-left-small:0px;"><h1 class="fusion-title-heading title-heading-left fusion-responsive-typography-calculated" style="margin:0;--fontSize:38;line-height:1.11;"><h1>Sykes Global Office Relocation by Purdie Worldwide</h1></h1></div><div class="fusion-clearfix"></div></div></div><div class="fusion-layout-column fusion_builder_column fusion-builder-column-22 fusion_builder_column_2_3 2_3 fusion-two-third fusion-column-first" style="--awb-bg-size:cover;--awb-margin-bottom:0px;width:65.3333%; margin-right: 4%;"><div class="fusion-column-wrapper fusion-flex-column-wrapper-legacy"><div class="fusion-text fusion-text-22"><p style="font-size: 18px;">Several years ago we were approached by Sykes Global in the creation of an office space in Galashiels. Fast forward to 2017 and Purdie Worldwide have partnered up again with Sykes Global in their office relocation from Galashiels to Currie House in Edinburgh.</p>
<h2>Client Requirement</h2>
<ul>
<li>Collect 164 chairs and office desks from Storage Facility in Galashiels</li>
<li>Transport of 164 chairs and office desks from Galashiels to Currie House in Edinburgh</li>
<li>Re-assembly of 164 office desks across two floors of Currie House</li>
<li>Desks and Chairs to be aligned according to architect’s plan</li>
<li>Workstations to be completed by 7th July to allow the IT team to install and setup the computers</li>
</ul>
</div><div class="fusion-image-element fusion-image-align-center in-legacy-container" style="text-align:center;--awb-caption-title-font-family:var(--h2_typography-font-family);--awb-caption-title-font-weight:var(--h2_typography-font-weight);--awb-caption-title-font-style:var(--h2_typography-font-style);--awb-caption-title-size:var(--h2_typography-font-size);--awb-caption-title-transform:var(--h2_typography-text-transform);--awb-caption-title-line-height:var(--h2_typography-line-height);--awb-caption-title-letter-spacing:var(--h2_typography-letter-spacing);"><div class="imageframe-align-center"><span class=" fusion-imageframe imageframe-none imageframe-14 hover-type-none"><img decoding="async" width="720" height="480" title="purdie-sykesglobal" src="https://bar.co.uk/wp-content/uploads/2018/07/purdie-sykesglobal.jpg" alt class="img-responsive wp-image-25762" srcset="https://bar.co.uk/wp-content/uploads/2018/07/purdie-sykesglobal-200x133.jpg 200w, https://bar.co.uk/wp-content/uploads/2018/07/purdie-sykesglobal-400x267.jpg 400w, https://bar.co.uk/wp-content/uploads/2018/07/purdie-sykesglobal-600x400.jpg 600w, https://bar.co.uk/wp-content/uploads/2018/07/purdie-sykesglobal.jpg 720w" sizes="(max-width: 767px) 100vw, 720px" /></span></div></div><div class="fusion-sep-clear"></div><div class="fusion-separator fusion-full-width-sep" style="margin-left: auto;margin-right: auto;margin-top:30px;width:100%;"></div><div class="fusion-sep-clear"></div><div class="fusion-text fusion-text-23"><h2>Project Solution</h2>
<ul>
<li>Transport of 164 chairs and desks to Currie House</li>
<li>Deliver 164 chairs and desks into the first floor of Currie House</li>
<li>3-man team over 3 days, job split into 3 sections (55 tables per day)</li>
<li>The first floor consisted of 110 workstations, whereas the second floor consisted of 54 workstations. The first floor should be completed over 2 days, with the second floor being completed on the 3rd day, as long as an average of approximately 55 desks were being built per day.</li>
</ul>
<p>The desks and chairs had been delivered to Currie House the day before by a previous crew and unfortunately, as they did not have a copy of the plan, had placed the majority of the chairs and desks in the locations where workstations would have been. So in order to put a completed workstation in its correct location we would have to move the 10 high stacked table tops. This would not be very efficient.</p>
<p>As a result, we split the team into 3 and assigned tasks. Worker 1’s task was to move the table tops blocking our way to a more accessible and convenient location. Worker 2’s task was to start bringing the pieces of each desk together (each desk consisted of a table top, a left leg, a right leg, a backboard and a cable tray). With the pieces of each desk brought together they were placed in their relevant locations in the office. Worker 3 had the task of assembling the desks once they had been put into place. Task 3 would take the longest, whereas soon as Worker 1 had finished, they would come in behind Worker 3 and start flipping and aligning the desks according to the plan. Once Worker 2 had finished location and positioning the desk pieces he would start bringing in the chairs from the more convenient location Worker 1 had setup.</p>
<p>This solution worked well for the first 2 days, and along with liaising with the painters to ensure we weren’t putting desks in places that hadn’t been painted yet, nothing else went wrong until day 3.</p>
<p>The desks for the second floor were unfortunately slightly different to the ones we re-assembled for the first floor. These desks were a lot older. In fact, the British Telecom stickers on the underside bore the year 1998. Yes, these desks were almost 20 years old.</p>
<p>The issue with the age of the desks came into play when we first tried to flip over the first re-assembled desk. These desks had a similar design to the first desks except the legs bolted onto a metal rectangular frame that was in turn bolted to the underside of the desks. Unfortunately, when we lifted the desks over, the weight of the frame and legs were too much for the small plastic fixings in the 20-year-old chipboard, so as we lifted the desks up, the frame and legs fell away.</p>
<p>In order to resolve the situation, we had to purchase 100 new screws and fixings, along with a taped drill bit to ensure that we didn’t puncture the desks completely, and manually reaffixed the frames and legs for every desk.</p>
<p>Lesson of the week? Do a feasibility test of how easy the desks will be to put back together before quoting.</p>
</div><div class="fusion-clearfix"></div></div></div><div class="fusion-layout-column fusion_builder_column fusion-builder-column-23 fusion_builder_column_1_3 1_3 fusion-one-third fusion-column-last" style="--awb-padding-top:20px;--awb-padding-right:20px;--awb-padding-bottom:20px;--awb-padding-left:20px;--awb-bg-size:cover;--awb-border-color:#eaeaea;--awb-border-top:1px;--awb-border-right:1px;--awb-border-bottom:1px;--awb-border-left:1px;--awb-border-style:solid;width:30.6666%;"><div class="fusion-column-wrapper fusion-flex-column-wrapper-legacy"><div class="fusion-image-element fusion-image-align-center in-legacy-container" style="text-align:center;--awb-caption-title-font-family:var(--h2_typography-font-family);--awb-caption-title-font-weight:var(--h2_typography-font-weight);--awb-caption-title-font-style:var(--h2_typography-font-style);--awb-caption-title-size:var(--h2_typography-font-size);--awb-caption-title-transform:var(--h2_typography-text-transform);--awb-caption-title-line-height:var(--h2_typography-line-height);--awb-caption-title-letter-spacing:var(--h2_typography-letter-spacing);"><div class="imageframe-align-center"><span class=" fusion-imageframe imageframe-none imageframe-15 hover-type-none"><img decoding="async" width="350" height="290" title="purdie-logo" src="https://bar.co.uk/wp-content/uploads/2017/03/purdie-logo.jpg" alt class="img-responsive wp-image-25736" srcset="https://bar.co.uk/wp-content/uploads/2017/03/purdie-logo-200x166.jpg 200w, https://bar.co.uk/wp-content/uploads/2017/03/purdie-logo.jpg 350w" sizes="(max-width: 767px) 100vw, 350px" /></span></div></div><div class="fusion-sep-clear"></div><div class="fusion-separator fusion-full-width-sep" style="margin-left: auto;margin-right: auto;margin-top:30px;width:100%;"></div><div class="fusion-sep-clear"></div><div class="fusion-text fusion-text-24"><p style="text-align: center;"><strong>Purdie Worldwide Removals &amp; Storage Ltd</strong></p>
<p style="text-align: center;"><a href="https://www.purdieworldwide.co.uk/">www.purdieworldwide.co.uk</a><br />
<strong><br />
Telephone:</strong><br />
01506 652792</p>
</div><div class="fusion-clearfix"></div></div></div></div></div>
<p>The post <a href="https://bar.co.uk/portfolio-items/sykes-global-office-relocation-by-purdie-worldwide/">Sykes Global Office Relocation by Purdie Worldwide</a> appeared first on <a href="https://bar.co.uk">British Association of Removers</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Pickfords Business Solutions Relocate The National Soil Resources Institute and Cranfield University</title>
		<link>https://bar.co.uk/portfolio-items/pickfords-business-solutions-relocate-the-national-soil-resources-institute-and-cranfield-university/</link>
		
		<dc:creator><![CDATA[jo@rubiconmarketing.net]]></dc:creator>
		<pubDate>Fri, 02 Jun 2017 08:59:40 +0000</pubDate>
				<guid isPermaLink="false">https://bar.co.uk/?post_type=avada_portfolio&#038;p=25802</guid>

					<description><![CDATA[<p>Pickfords Business Solutions Relocate The National Soil Resources Institute and Cranfield University   Requirements included: Relocation of specialist bespoke machinery and equipment, including large combine harvesters, historic tractors, quality and testing equipment, ex-Formula 1 cars and hydraulic ramps. Relocation of one item too large for road transportation and too heavy for Chinook helicopter  [...]</p>
<p>The post <a href="https://bar.co.uk/portfolio-items/pickfords-business-solutions-relocate-the-national-soil-resources-institute-and-cranfield-university/">Pickfords Business Solutions Relocate The National Soil Resources Institute and Cranfield University</a> appeared first on <a href="https://bar.co.uk">British Association of Removers</a>.</p>
]]></description>
										<content:encoded><![CDATA[<div class="fusion-fullwidth fullwidth-box fusion-builder-row-9 nonhundred-percent-fullwidth non-hundred-percent-height-scrolling" style="--awb-border-radius-top-left:0px;--awb-border-radius-top-right:0px;--awb-border-radius-bottom-right:0px;--awb-border-radius-bottom-left:0px;--awb-flex-wrap:wrap;" ><div class="fusion-builder-row fusion-row"><div class="fusion-layout-column fusion_builder_column fusion-builder-column-24 fusion_builder_column_1_1 1_1 fusion-one-full fusion-column-first fusion-column-last" style="--awb-bg-size:cover;"><div class="fusion-column-wrapper fusion-flex-column-wrapper-legacy"><div class="fusion-title title fusion-title-9 fusion-sep-none fusion-title-text fusion-title-size-one" style="--awb-margin-top-small:0px;--awb-margin-right-small:0px;--awb-margin-bottom-small:20px;--awb-margin-left-small:0px;"><h1 class="fusion-title-heading title-heading-left fusion-responsive-typography-calculated" style="margin:0;--fontSize:38;line-height:1.11;"><h1>Pickfords Business Solutions Relocate The National Soil Resources Institute and Cranfield University</h1></h1></div><div class="fusion-clearfix"></div></div></div><div class="fusion-layout-column fusion_builder_column fusion-builder-column-25 fusion_builder_column_2_3 2_3 fusion-two-third fusion-column-first" style="--awb-bg-size:cover;--awb-margin-bottom:0px;width:65.3333%; margin-right: 4%;"><div class="fusion-column-wrapper fusion-flex-column-wrapper-legacy"><div class="fusion-text fusion-text-25"><p style="font-size: 18px;">Requirements included: Relocation of specialist bespoke machinery and equipment, including large combine harvesters, historic tractors, quality and testing equipment, ex-Formula 1 cars and hydraulic ramps. Relocation of one item too large for road transportation and too heavy for Chinook helicopter transportation. Relocation of 30 tonnes of soil from a processor and sourcing of sand equivalent to Saharan sand.</p>
<h2>Solution and Result</h2>
<p>Pickfords Business Solutions and Merrits Transport Services worked together to provide a turnkey solution for the specialist research department. One item initially too large for transportation was cut in half and re-assembled, re-welded and re-painted once installed in the new location.</p>
</div><div class="fusion-image-element fusion-image-align-center in-legacy-container" style="text-align:center;--awb-caption-title-font-family:var(--h2_typography-font-family);--awb-caption-title-font-weight:var(--h2_typography-font-weight);--awb-caption-title-font-style:var(--h2_typography-font-style);--awb-caption-title-size:var(--h2_typography-font-size);--awb-caption-title-transform:var(--h2_typography-text-transform);--awb-caption-title-line-height:var(--h2_typography-line-height);--awb-caption-title-letter-spacing:var(--h2_typography-letter-spacing);"><div class="imageframe-align-center"><span class=" fusion-imageframe imageframe-none imageframe-16 hover-type-none"><img decoding="async" width="720" height="480" title="pickfords-casestudy" src="https://bar.co.uk/wp-content/uploads/2018/07/pickfords-casestudy.jpg" alt class="img-responsive wp-image-25761" srcset="https://bar.co.uk/wp-content/uploads/2018/07/pickfords-casestudy-200x133.jpg 200w, https://bar.co.uk/wp-content/uploads/2018/07/pickfords-casestudy-400x267.jpg 400w, https://bar.co.uk/wp-content/uploads/2018/07/pickfords-casestudy-600x400.jpg 600w, https://bar.co.uk/wp-content/uploads/2018/07/pickfords-casestudy.jpg 720w" sizes="(max-width: 767px) 100vw, 720px" /></span></div></div><div class="fusion-sep-clear"></div><div class="fusion-separator fusion-full-width-sep" style="margin-left: auto;margin-right: auto;margin-top:30px;width:100%;"></div><div class="fusion-sep-clear"></div><div class="fusion-text fusion-text-26"><p>Following arrangement of the PUWER Assessment Survey “Provision of Use of Workplace Equipment”, all equipment was updated and many pieces re-engineered to be compliant with the current regulations providing safe systems and safe places to work.</p>
<p>Pickfords Business Solutions supplied engineering and technical services to ensure all equipment transferred was safe once re-connected and that safe practices were employed.</p>
<p>When transporting the soil lane processor &#8211; which weighed in excess of 5 tons and, prior to moving had no access restrictions to the facility whilst operational &#8211;  Pickfords put in place adequate guarding, control gates and signs clearly providing a safe working area.</p>
<p>Ceri Dawson, the senior technical officer at Cranfield University, would recommend Pickfords Business Solutions for any large, complicated move requiring specialist knowledge.</p>
</div><div class="fusion-clearfix"></div></div></div><div class="fusion-layout-column fusion_builder_column fusion-builder-column-26 fusion_builder_column_1_3 1_3 fusion-one-third fusion-column-last" style="--awb-padding-top:20px;--awb-padding-right:20px;--awb-padding-bottom:20px;--awb-padding-left:20px;--awb-bg-size:cover;--awb-border-color:#eaeaea;--awb-border-top:1px;--awb-border-right:1px;--awb-border-bottom:1px;--awb-border-left:1px;--awb-border-style:solid;width:30.6666%;"><div class="fusion-column-wrapper fusion-flex-column-wrapper-legacy"><div class="fusion-image-element fusion-image-align-center in-legacy-container" style="text-align:center;--awb-caption-title-font-family:var(--h2_typography-font-family);--awb-caption-title-font-weight:var(--h2_typography-font-weight);--awb-caption-title-font-style:var(--h2_typography-font-style);--awb-caption-title-size:var(--h2_typography-font-size);--awb-caption-title-transform:var(--h2_typography-text-transform);--awb-caption-title-line-height:var(--h2_typography-line-height);--awb-caption-title-letter-spacing:var(--h2_typography-letter-spacing);"><div class="imageframe-align-center"><span class=" fusion-imageframe imageframe-none imageframe-17 hover-type-none"><img decoding="async" width="350" height="161" title="picfords-logo" src="https://bar.co.uk/wp-content/uploads/2017/03/picfords-logo.jpg" alt class="img-responsive wp-image-25737" srcset="https://bar.co.uk/wp-content/uploads/2017/03/picfords-logo-200x92.jpg 200w, https://bar.co.uk/wp-content/uploads/2017/03/picfords-logo.jpg 350w" sizes="(max-width: 767px) 100vw, 350px" /></span></div></div><div class="fusion-sep-clear"></div><div class="fusion-separator fusion-full-width-sep" style="margin-left: auto;margin-right: auto;margin-top:30px;width:100%;"></div><div class="fusion-sep-clear"></div><div class="fusion-text fusion-text-27"><p style="text-align: center;"><strong>Pickfords</strong></p>
<p style="text-align: center;"><a href="http://www.pickfords.co.uk/">www.pickfords.co.uk</a><br />
<strong><br />
Telephone:</strong><br />
0845 130 6559</p>
</div><div class="fusion-clearfix"></div></div></div></div></div>
<p>The post <a href="https://bar.co.uk/portfolio-items/pickfords-business-solutions-relocate-the-national-soil-resources-institute-and-cranfield-university/">Pickfords Business Solutions Relocate The National Soil Resources Institute and Cranfield University</a> appeared first on <a href="https://bar.co.uk">British Association of Removers</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>The Francis Crick Institute go Business Class with Premier Workplace Services</title>
		<link>https://bar.co.uk/portfolio-items/the-francis-crick-institute-go-business-class-with-premier-workplace-services/</link>
		
		<dc:creator><![CDATA[jo@rubiconmarketing.net]]></dc:creator>
		<pubDate>Wed, 31 May 2017 08:51:20 +0000</pubDate>
				<guid isPermaLink="false">https://bar.co.uk/?post_type=avada_portfolio&#038;p=25784</guid>

					<description><![CDATA[<p>The Francis Crick Institute go Business Class with Premier Workplace Services   The Francis Crick Institute is a biomedical discovery facility dedicated to understanding why disease develops and to find new ways to treat, diagnose and prevent illness. The creation of this state-of-the-art facility with nearly one million square foot of floor space  [...]</p>
<p>The post <a href="https://bar.co.uk/portfolio-items/the-francis-crick-institute-go-business-class-with-premier-workplace-services/">The Francis Crick Institute go Business Class with Premier Workplace Services</a> appeared first on <a href="https://bar.co.uk">British Association of Removers</a>.</p>
]]></description>
										<content:encoded><![CDATA[<div class="fusion-fullwidth fullwidth-box fusion-builder-row-10 nonhundred-percent-fullwidth non-hundred-percent-height-scrolling" style="--awb-border-radius-top-left:0px;--awb-border-radius-top-right:0px;--awb-border-radius-bottom-right:0px;--awb-border-radius-bottom-left:0px;--awb-flex-wrap:wrap;" ><div class="fusion-builder-row fusion-row"><div class="fusion-layout-column fusion_builder_column fusion-builder-column-27 fusion_builder_column_1_1 1_1 fusion-one-full fusion-column-first fusion-column-last" style="--awb-bg-size:cover;"><div class="fusion-column-wrapper fusion-flex-column-wrapper-legacy"><div class="fusion-title title fusion-title-10 fusion-sep-none fusion-title-text fusion-title-size-one" style="--awb-margin-top-small:0px;--awb-margin-right-small:0px;--awb-margin-bottom-small:20px;--awb-margin-left-small:0px;"><h1 class="fusion-title-heading title-heading-left fusion-responsive-typography-calculated" style="margin:0;--fontSize:38;line-height:1.11;"><h1>The Francis Crick Institute go Business Class with Premier Workplace Services</h1></h1></div><div class="fusion-clearfix"></div></div></div><div class="fusion-layout-column fusion_builder_column fusion-builder-column-28 fusion_builder_column_2_3 2_3 fusion-two-third fusion-column-first" style="--awb-bg-size:cover;--awb-margin-bottom:0px;width:65.3333%; margin-right: 4%;"><div class="fusion-column-wrapper fusion-flex-column-wrapper-legacy"><div class="fusion-text fusion-text-28"><p style="font-size: 18px;">The Francis Crick Institute is a biomedical discovery facility dedicated to understanding why disease develops and to find new ways to treat, diagnose and prevent illness. The creation of this state-of-the-art facility with nearly one million square foot of floor space in Kings Cross was one of the single biggest construction projects in the UK in recent times.</p>
</div><div class="fusion-image-element fusion-image-align-center in-legacy-container" style="text-align:center;--awb-caption-title-font-family:var(--h2_typography-font-family);--awb-caption-title-font-weight:var(--h2_typography-font-weight);--awb-caption-title-font-style:var(--h2_typography-font-style);--awb-caption-title-size:var(--h2_typography-font-size);--awb-caption-title-transform:var(--h2_typography-text-transform);--awb-caption-title-line-height:var(--h2_typography-line-height);--awb-caption-title-letter-spacing:var(--h2_typography-letter-spacing);"><div class="imageframe-align-center"><span class=" fusion-imageframe imageframe-none imageframe-18 hover-type-none"><img decoding="async" width="720" height="480" title="premier-crickins" src="https://bar.co.uk/wp-content/uploads/2018/07/premier-crickins.jpg" alt class="img-responsive wp-image-25766" srcset="https://bar.co.uk/wp-content/uploads/2018/07/premier-crickins-200x133.jpg 200w, https://bar.co.uk/wp-content/uploads/2018/07/premier-crickins-400x267.jpg 400w, https://bar.co.uk/wp-content/uploads/2018/07/premier-crickins-600x400.jpg 600w, https://bar.co.uk/wp-content/uploads/2018/07/premier-crickins.jpg 720w" sizes="(max-width: 767px) 100vw, 720px" /></span></div></div><div class="fusion-sep-clear"></div><div class="fusion-separator fusion-full-width-sep" style="margin-left: auto;margin-right: auto;margin-top:30px;width:100%;"></div><div class="fusion-sep-clear"></div><div class="fusion-text fusion-text-29"><p>Merging the Medical Research Council&#8217;s National Institute for Medical Research and Cancer Research UK’s London Research Institute under one roof, the project included the most significant scientific laboratory relocation of its kind in Europe and required the migration of:</p>
<ul>
<li>1,500 staff</li>
<li>101 lab groups</li>
<li>15 specialist technology platforms</li>
<li>University partner moves</li>
<li>17,500 laboratory equipment items</li>
<li>1,500 crates of chemicals</li>
<li>Desktop and server equipment</li>
<li>Live cold move including fridges &amp; freezers, liquid nitrogen vessels</li>
<li>Specialist areas such as Drosophila (fruit flies), BRF, Insectary</li>
<li>Containment levels 3 and 4</li>
<li>Hazardous and biological materials</li>
<li>Bespoke and standard glassware</li>
<li>Laboratory consumables</li>
<li>Write up area crates</li>
</ul>
<p>Premier put together a multi-disciplined account management team to support continuous professional delivery of this diverse and specialist project. Premier also increased their in-house staff training and invested significantly in additional specialist fleet to enable maximum in house delivery ensuring the consistency of staff and resources.</p>
</div><div class="fusion-clearfix"></div></div></div><div class="fusion-layout-column fusion_builder_column fusion-builder-column-29 fusion_builder_column_1_3 1_3 fusion-one-third fusion-column-last" style="--awb-padding-top:20px;--awb-padding-right:20px;--awb-padding-bottom:20px;--awb-padding-left:20px;--awb-bg-size:cover;--awb-border-color:#eaeaea;--awb-border-top:1px;--awb-border-right:1px;--awb-border-bottom:1px;--awb-border-left:1px;--awb-border-style:solid;width:30.6666%;"><div class="fusion-column-wrapper fusion-flex-column-wrapper-legacy"><div class="fusion-image-element fusion-image-align-center in-legacy-container" style="text-align:center;--awb-caption-title-font-family:var(--h2_typography-font-family);--awb-caption-title-font-weight:var(--h2_typography-font-weight);--awb-caption-title-font-style:var(--h2_typography-font-style);--awb-caption-title-size:var(--h2_typography-font-size);--awb-caption-title-transform:var(--h2_typography-text-transform);--awb-caption-title-line-height:var(--h2_typography-line-height);--awb-caption-title-letter-spacing:var(--h2_typography-letter-spacing);"><div class="imageframe-align-center"><span class=" fusion-imageframe imageframe-none imageframe-19 hover-type-none"><img decoding="async" width="350" height="125" title="premier-logo" src="https://bar.co.uk/wp-content/uploads/2017/03/premier-logo.jpg" alt class="img-responsive wp-image-25735" srcset="https://bar.co.uk/wp-content/uploads/2017/03/premier-logo-200x71.jpg 200w, https://bar.co.uk/wp-content/uploads/2017/03/premier-logo.jpg 350w" sizes="(max-width: 767px) 100vw, 350px" /></span></div></div><div class="fusion-sep-clear"></div><div class="fusion-separator fusion-full-width-sep" style="margin-left: auto;margin-right: auto;margin-top:30px;width:100%;"></div><div class="fusion-sep-clear"></div><div class="fusion-text fusion-text-30"><p style="text-align: center;"><strong>Premier Workplace Services</strong></p>
<p style="text-align: center;"><a href="http://www.premierworkplaceservices.co.uk/">www.premierworkplaceservices.co.uk</a><br />
<strong><br />
Telephone:</strong><br />
020 8976 2100</p>
</div><div class="fusion-clearfix"></div></div></div></div></div>
<p>The post <a href="https://bar.co.uk/portfolio-items/the-francis-crick-institute-go-business-class-with-premier-workplace-services/">The Francis Crick Institute go Business Class with Premier Workplace Services</a> appeared first on <a href="https://bar.co.uk">British Association of Removers</a>.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
